TWU/MTA Contract Wins Landslide Ratification Vote, 82 Percent YES!

DIVISION YES NO Total Of Vote % YES
CAR EQUIPMENT 1411 691 2102 67.1%
LINE EQUIPMENT/SIGNALS 1554 179 1733 89.7%
POWER 282 132 414 68.1%
STRUCTURE 773 132 905 85.4%
TRACK 567 189 756 75.0%
MABOA DIVISION I 804 48 852 94.4%
MABSTOA DIVISION II 1064 106 1170 90.9%
MABSTOA MAINTENANCE 807 37 844 95.6%
CONDUCTOR/TOWER 756 281 1037 72.9%
TRAIN OPERATORS 903 384 1287 70.2%
STATIONS 1348 228 1576 85.5%
SURFACE MAINTENANCE 500 69 569 87.9%
SURFACE OPERATORS 1689 205 1894 89.2%
Total 12458 2681 15139 82.3%